Moving to scrum: breakin’ the law

Well, part of the whole idea is that scrum isn’t a hard-and-fast set of rules right? I had some meetings at another office last week which necessitated moving out our first sprint review and retrospective a couple days. So if one of the guiding principals of scrum (and agile in general) is that the dates don’t change, everything else does, that got blown right out of the gate.

Some new stories came up as part of the sprint wrap-up which means that we’ll need to do a new planning poker session. Also, some other things came up which mean that there is a bit of housekeeping to do before we start the second sprint. We’re now in some uncharted zone between two sprints while the product manager and scrum master do some cleanup while the scrum teams do some off-book work for a couple days. Yeah, not ideal, but we’re trying to get it back on track. This sprint was going to be a throw-away anyway as it involved a lot of transition and getting used to the framework.

The retrospective brought up some really good issues and some innovative suggestions from the team on how to handle them. If the suggestions work out, I’ll post them here eventually.

There are still some folks unclear on what we expect to gain by transitioning to a new development process, but most of the team is embracing it as a good experiment and chance to try something new. For the most part, everyone seems to have an open mind and that definitely makes a huge difference as we all try to figure this out together. It hasn’t been the smoothest transition, but so far so good, I think. We’re definitely not as productive as we were before (so far). However, I think that the discipline provided by the product backlog means that we are actually getting the most important things done first. That makes a huge difference.

moving to scrum: The First Planning Poker

That could have gone a lot better.

I had originally prepared the product backlog with stories that were way too large. I think that I was confusing the role of the Scrum Product Owner and the XP Customer a bit. I was worried about “being polluted.” After reviewing the Scrum planning process again, I realized that I really needed to break up the top priority stories. I took the top dozen and broke them up into around 40 smaller stories. Some I left for the team to break up as an exercise. I needed input from the team leads to break up a few of the stories, so I left them as epics. There were a few stories that defied division. These were large design tasks. We have to interface with a couple other teams and get some customer feedback, so we need to have some initial designs to present that are somewhat comprehensive. I knew that this would be difficult to incorporate in an Agile process, but it is a part of our work and I wanted to try and assimilate it. We also had some carry-over work from the previous release and some open-ended consulting that we needed to account for in our estimations. The carry-over work was interrupt-based, basically bugs found by other teams that we would need to turn around quickly. To incorporate this into the planning, I created a story at upmost priority to account for this possible work.

Given the distributed nature of the team, I decided to do the planning poker on-line. I booked some video conference rooms, but also a phone conference. Since physical cards would not work for us, we used Adobe Connect (‘natch) with a polling pod for each person to put in their card choice. I figured that most of the team would hang out in their offices and dial in to the meeting, but everyone came to the conference rooms and that actually worked really well.

I’d budgeted about 2 hours for Planning Poker. I figured that this would give us time to get into the process and go through a few sprints worth of stories. Turns out that my estimating skills on planning poker needs some work itself.

The hard-to-estimate high priority stories derailed us for a long time. Especially the open-ended consulting and bug fixing tasks. The team got stuck on estimating an unknown. It took a lot of time and a lot of frustration, but we finally reached a rough consensus and moved on to the difficult-to-split design tasks. We tried a zillion ways to split them up or come up with better estimates. In the end they got a high estimate and were tabled to the sprint planning meeting. In retrospect, even though these stories were the highest priority, I probably should have started us on the concrete tasks and come back to these later in the session. For a team’s first planning session these were some pretty tough tasks to work through.

Once we got past these tasks, it got a bit better, but it was still difficult. The team got too caught up in the details of each story, unable to make an estimate before digging deep. If there was uncertainty, we got really deep in the weeds. The 2 minute timer didn’t help. The more concrete stories that needed to be broken up took a lot more time than I expected too. Members of the team kept wanting to discuss details on each story. The scrum master and I kept trying to bring us back to the sprit of estimation, but it was a slog. After almost three hours, we had only gotten through a dozen stories, not even enough to get us through our first sprint. I’m going to look for better ways to explain the spirit and intent of Agile estimation to the team. It is difficult to grasp sometimes for detail-oriented folks.

Even though we were short of estimated stories, we went ahead with our first planning meetings anyway. One team was able to take on stories and create tasks and estimates from them. They may be a bit short of work, but they made some progress. The other team had difficulty pulling stories given the paucity of choices.

We learned some useful things today. We separated the teams to do the sprint planning, pulling from the backlog. The teams were in separate video conference rooms. I and the scrum master moved between them. We realized afterwards that we really need to have both teams together to figure out how the stories would be divided and then the teams should have separated to create their tasks and do their estimations. I was also too eager to jump into the poker session itself,  and I didn’t spend enough time going through the backlog with the team and discussing my priorities. We’ll fix these issues next time.

We’ll do a second planning poker session tomorrow. Before then, I’ll take in the new stories we created in the backlog, make sure that they are prioritized correctly, and try to break up some more of the stories so that we don’t have to spend time doing that in the poker session.

I knew the first planning poker session was going to be a bit rocky as we felt our way through the process, but for me it was brutal. I know that as we gain experience it will get progressively easier and so I’m more worried about the team’s morale right now than I am concerned about the process. We’ll see how it goes.

On one hand, our super short sprints play to our advantage as it lets us try stuff out in a sprint without a huge commitment. On the other hand, it makes breaking stories up into sprint-sized chunks really difficult. It feels a bit like we’ve jumped into the deep end because of this. We’re open to making a lot of changes, but we’re hoping to keep a consistent sprint length through the cycle since modifying the duration of our sprints will make it difficult to establish a rhythm. Again, we’ll see how it goes.

Converting from agile-mumble to Scrum: the introduction

I’ve been a convert to Agile for almost a decade now. I was first exposed to it when I was working at a start-up called Bootleg Networks as a Development Lead (don’t bother looking it up, it is long lost to time). I’d just come from six years at Microsoft where Waterfall was the only methodology and it was followed religiously. I’d seen all the worst aspects of Waterfall and seen nearly none of the best, but I wasn’t up on any other methodology besides Ad-hoc (also known as “play it by ear”). We’d hired Carmine Mangione as our software architect and he came in spouting all this stuff about “Agile” and “XP.” While I was definitely ready to try a different style of development, it all sounded a bit unstructured to me. Carmine convinced me to try eXtreme Programming, promising that if it didn’t work, we’d drop it. We bought a stack of Kent Beck’s book for the team and jumped into it. I went from Development Lead to XP Coach and quickly became a convert.

We achieved a ton of stuff using XP at Bootleg very quickly with a relatively small team. That short stint really changed my mind on how professional software development could be done. Ever since then, I have found ways to incorporate as many aspects of agile methodologies into any place I’ve worked.

I ended up back at Microsoft a couple years later. The situation there had changed quite a bit. While most of the company was still doing waterfall, more developers were aware of Agile and were curious about it (even if their managers weren’t). I took on a risky new project. It was fixing an ancient set of code written originally by Microsoft, but completely eroded over the years by a series of contractors. It was a mess: full of bugs. Customers didn’t like it. Rather than try to fix it, I convinced them to let me and a small team rewrite it from scratch to clean it up and get the new functionality needed. Program Management was skeptical, Quality Engineering was dead-set against it. I put my neck out and promised that we’d bring it in on-time with a high-level of quality that would be instantly verifiable with a battery of developer-written unit tests. We got some initial buy in and we went to work. We followed as much of XP as we could with an undersized (4 person) development team. Needless to say, we got it done and it shipped as part of WinCE 5.0.

I left Microsoft to join Adobe and was really happy to see that Agile was not only acknowledged, but embraced across many groups in the company. There were many different flavors being used, including several custom ones. Scrum was fairly common though.

I was certainly aware of Scrum, but didn’t have too high an opinion of it. Everything I’d read and heard about it made it seem like it had nearly no process or structure. Looking at how different teams “followed” scrum practices, it seemed like it was just an excuse for Cowboy Coding with a tiny amount of coordination involved. It seemed like a parody of Agile to me at first.

At Adobe, I was lucky enough to be able to build a completely new team. For various reasons, the team ended up being split between two different offices. While I wanted us to follow an Agile methodology, after a lot of research, I couldn’t identify one that would really work for us wholesale. Instead, I took the pieces that made sense and incorporated them as I could. We ended up with a unique process that subsumed bits of Rational (short sprints at first, longer sprints in the middle and short sprints again at the end; co-located functional teams), XP (test-driven development, occasional paired programming, be able to deliver at the end of each milestone, constant refactoring and narrow focus) and Scrum (demo-able at end of each sprint). That was the goal process. Of course, we didn’t always get there. We were pretty open and made a lot of changes along the way to incorporate new best practices and dump the parts that didn’t work. This evolving process worked fairly well and we have had three successful product cycles over several years using it.

For all the good of our existing cobbled-together development framework, we were always finding the seams, the edges that didn’t quite meet. There were other issues too. Having co-located functional teams meant that each team had good velocity, but it also meant that cross-site communication was always a problem and it made collaboration difficult as well. The team was getting too silo’d in my opinion. I wanted to really mix things up for our next cycle and try something totally new.

Over time, I’d gotten over my initial knee-jerk reaction to Scrum as I encountered more teams using it in a more deliberate and successful way. One weakness I still saw was the difficulty of using Scrum in non-co-located teams, but I met teams that came up with ways to manage this.

I decided that we would try Scrum for our next cycle. If it worked for us we would continue to use it for future cycles. If it didn’t, we would incorporate whatever worked for us back into our old process. Luckily, Adobe has a full-time Scrum trainer in the company. We did our scrum training a couple weeks ago, and we start our first Sprint tomorrow.

I’ve decided to document this on my blog for a few reasons:

  • It is something about Software Engineering that I can write about without fear of divulging corporate secrets
  • It might be interesting for other folks in similar circumstances
  • It is too long to tweet 🙂

My plan is to document our transition as much as I think might be interesting to others. Our situation is a little different from most since we are transitioning from a different Agile process to Scrum instead of from a non-Agile process. My team is also somewhat unusual since most of our clients are internal to the company who each use a different methodology (most Scrum, but some waterfall and some other Agile), but we also deliver our technology straight to Adobe’s customers on both long and short cycles. So we have a lot of impedance matches to account for. Some things may need to wait until the cycle is over for fear of disclosing too much, but by focusing on the process, I hope to be pretty open.

I’m not going to go too far into the mechanics of Scrum here since there are a zillion better places for that and because I’m still learning it myself. If I use a term you aren’t aware of and you can’t find a good answer on Google, ask me in the comments and I’ll try to answer it for you.

A bit on the details: My team doesn’t have a “Product Manager,” so I will be taking on the role of Product Owner even though I am the Engineering Manager. I’m not planning to act as a Scrum Master, that role will be taken by the QE manager of the team. If I have some free cycles I can use for development, I will act as a Scrum Team member, but I will not participate in Planning Poker as an estimator. We will have two scrum teams, each team incorporating developers and QEs from both of our sites. We’re going to do short sprints so that we can make changes quickly to our process.

I hope to create a little series here if I have time to keep it up to date.

Stay tuned.